857 McPherson Road, Sanford, NC 27330 bon7166@yahoo.com • Mobile 919-961-8787 • Home 919-777-6069 Desired Position: Scheduler Summary Over 25 years of Nuclear Power Plant experience. Very strong
analytical and problem solving skills. Team member for several projects
assisting with schedule work break down (WBS) reviews, daily tracking, and
critical path activity look aheads. Assisted Project Managers as an ALARA
Liaison (Rad Engineer) to keep the project on track by identifying schedule
conflicts or possible radiological hold-ups. Solid understanding of outage
and on-line plant operations. Excellent ability to understand and analyze
activities in a schedule for all disciplines and make recommendations to keep
project activities on track. Recognized for ownership and dedication to the
project in meeting milestones and problem resolution skills. Education/Certifications Project Management Primavera
Planning and Scheduling P6 – Oracle University Root Cause Analysis with
Corrective Action Six Sigma Green Belt B.S. in Psychology - Ottawa
University (16 credit hours to complete this degree) OSHA 30 Construction and
General Industry Occupational Safety and Health
Manager ANSI 3.1 Senior Health Physics
Technician
ANSI 3.1 Senior Chemistry
Effluents Technician Computer Skills Primavera P6, MS Excel, Word, and Outlook. Artemis ProjectView and
Passport. Experience: Rad. Engineer/ALARA Coordinator 12/2010 – 03/2010 Point Beach Nuclear Power Plant; Project Team member for the
GSI-191 Sump Project. Responsible for development of project dose estimate.
This required daily interface with Project Managers, Schedulers, Planners,
major stake holders, and field personnel to create, track, and adjust dose
estimate as needed. Interviewed key personnel to determine how
man-hours and resources would have total dose for impact the project.
Developed management and field operations reports to verify work status and
enable forecasting. The project was completed on time and dose goals
successfully met. Commended for ability to work under time pressure and
assist in the overall success of the project. Prepared in-progress and final
documentation reports to reflect original, added, and emergent scope
breakdowns. Experience: Continued ALARA Specialist / Rad. Engineer for these Steam Generator
Replacement Projects: 01/2005 – 11/2009 ·
Prairie Island Nuclear Power Station ·
Diablo Canyon Nuclear Power Station ·
Calloway Nuclear Power Station ·
Crystal River Nuclear Power Station Main responsibilities for these projects included being a team
member reviewing and providing schedule updates for radiological significant
events that impacted project activities (ProjectView, P3, P6). This aided
both the Project and the Health Physics Departments in being prepared, thus
avoiding work delays during the project. Attended shift schedule meetings to
status Health Physics activities such as shielding package installations and
updated these activities in ProjectView at Crystal River Power Station.
Interfaced daily with Major stake holders to schedule and perform necessary
HRA and LHRA briefings in such a manner as not to impede critical path work activities.
Provided dose estimates, work package reviews and ALARA briefs as needed to
support the project. Prepared documents for the Health Physics Technicians to
educate/assist in their understanding of High Risk Job evolutions. Provided
in-field support to ensure shielding packages were installed correctly,
coaching work crews on good ALARA practices. Senior Health Physics
Technician at the following Nuclear Power Plants 06/1980 – 12/1991 &
09/2001 - 01/2004 Prairie
Island, Point Beach, Saint Lucie, Fort Calhoun, Calvert Cliffs, Waterford Davis Besse, Oyster Creek, Shearon Harris, Duane Arnold, Beaver
Valley Perry, Washington Power, Millstone, and Hope Creek, Oconee, Palo
Verde Lead Senior Health Physics Technician for several outages.
Provided oversight and guidance for Plant Health Physic depts. for high risk
work evolutions during normal refuel and major projects. Knowledgeable in
both PWR and BWR plant systems. Provided job coverage for such work
activities as replacement of Steam Generators, Reactor Head, Pressurizer,
Charging Pumps, RHR Pumps, HPSI/LPSI pumps, etc. Steam Generator Eddy Current
Testing and Tube Plugging, Boric Acid Recovery, Weld-Overlays, Sump and Torus
modifications. Formal training in PWR plant systems, Health Physics, Nuclear
Physics, Count Room, Radiation Monitoring Equipment, and Source Control.
Calibrated radiation equipment. Emergency response team member for several
power plants participating in several NRC yearly drills. Senior Chemistry Effluents Technician - Palo Verde Nuclear Power
Station 01/1992 – 07/1997 Directly supported the Control Room in generating off-site
effluent release permits. Sampled and analyzed effluent release pathways.
Maintained radiological Tech. Spec. equipment and performed the required
testing. Supported Chemistry and Health Physics in monitoring plant
radiological conditions. Formal training in plant systems, calibration and
maintenance of permanent plant radiological monitors, chemistry, and nuclear
physics. Member of emergency response team participating in yearly NRC
drills. Resume of Bonnie M.
Walker